India offers some of the most generous residential solar subsidies in the world, and uptake is accelerating fast, though the scheme has room to run before it hits its target. Here is everything you need to know, in plain language.
PM Surya Ghar Muft Bijli Yojana, the central scheme
Launched in February 2024, PM Surya Ghar is India's flagship residential solar programme, targeting 1 crore homes by March 2027. It provides direct subsidies for rooftop installation and additionally promises 300 units of free electricity per month to eligible households. Uptake has accelerated sharply through FY 2025–26, with cumulative rooftop installations under the scheme now well past 40 lakh households nationally, still short of the 1-crore target, but a meaningful share of it.
System size
Central subsidy
Typical cost (before subsidy)
Net cost after subsidy
Approx annual saving
1 kW
₹30,000
₹70,000–80,000
₹40,000–50,000
₹10,000–13,000
2 kW
₹60,000
₹1.40–1.55L
₹80,000–95,000
₹20,000–26,000
3 kW
₹78,000
₹1.90–2.10L
₹1.12–1.32L
₹30,000–40,000
Above 3 kW
₹78,000 (cap)
₹2.40L+
₹1.60L+
₹40,000+
The structure behind these numbers: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third kW, capped at ₹78,000. Smaller systems cost more per kW installed (fixed costs of structure, wiring and net metering spread over fewer panels), which is why a 1 kW system isn't simply a third of a 3 kW price.
How to apply, step by step
Register on pmsuryaghar.gov.in, enter your state, DISCOM, electricity consumer number, and mobile number.
Receive feasibility approval from your DISCOM, usually 3–7 business days.
Choose an MNRE-empanelled vendor from the portal and verify their empanelment number.
Installation is completed and the installer submits the details on the portal.
Net meter installation and commissioning by your DISCOM, typically 15–30 days.
Subsidy is credited directly to your bank account, 30–60 days post-commissioning.
State-level top-up subsidies
A handful of states add their own incentive on top of the central amount, though several of these are targeted at specific categories (rural, EWS, SC/ST) rather than every applicant, and terms shift often. For a 3 kW system:
State
Central (3 kW)
State top-up
Scheme
Gujarat
₹78,000
+ ₹10,000/kW, up to ₹20k–30k
GEDA / Surya Gujarat
Rajasthan
₹78,000
+ variable, category-dependent
RREC
Maharashtra
₹78,000
+ top-up for rural/EWS households
MSEDCL SMART Solar
Uttar Pradesh
₹78,000
+ support, largely SC/ST-targeted
UPNEDA
Delhi
₹78,000
+ small top-up & per-unit export incentive
BSES / TPDDL
Tamil Nadu
₹78,000
Net-meter fee waived (<5 kW)
TANGEDCO
Karnataka
₹78,000
Nil, fastest DISCOM turnaround instead
BESCOM
Important
State subsidies are the most volatile numbers on this page, amounts, eligibility and even which states offer them change with annual state budgets, and several "top-ups" apply only to specific income or social categories rather than every applicant. Treat this table as directional. Always confirm the current figure on your state's DISCOM or renewable energy development agency site, or with an MNRE-empanelled installer, before signing a contract.
Don't leave ₹78,000 on the table